GUCCI Hub

Milan, イタリア
The large hangar is directly connected to the industrial warehouses, set out in a regular pattern across the site and featuring modular structural bays. It hosts events and fashion shows.
写真 © Andrea Martiradonna
The large hangar is directly connected to the industrial warehouses, set out in a regular pattern across the site and featuring modular structural bays. It hosts events and fashion shows.
写真 © Andrea Martiradonna
Pedestrian paths run between the buildings in a sequence of solid structures and empty spaces in which landscaping plays a key role: running across the site and smoothly interacting between the old buildings and green spaces.
写真 © Andrea Martiradonna
The project incorpotares a six-storey tower in its industrial fabric of warehouses and hangers, which interact closely with the old constructions.
Final Project
建築家
piuarch
住所
Via Mecenate, 79, 20138, Milan, イタリア
2016
費用
非公開
階数
非公開
クライエント
Kering Spa
チーム
Alessandra Bertoli, Silvia Calzetti, Erica Cazzaniga, Davide Fascione, Niccolò Genesio, Gianluca Iannotta, Luca Lazzerotti, Alessandro Leanti, Mauro Mandelli, Alessandro Marchesetti, Gianni Mollo, Carlos Noriega, Enrico Pellegrini, Paola Sarcoli, Salvatore Seggio, Federico Simonetti, Jenny Spagnoletti, Santiago Trujillo, Yun Xiao, Anna Zauli

The redevelopment project of the old Caproni factory focuses on enhancing the stylistic features of the 1920s’ architecture and aims to transform this old plant into the new Gucci Headquarters in Milan. The abandoned industrial warehouses, covered by a shed style roof that lets zenith light flow into the interiors and characterized by modular structural bays, create through the spatial layout seamless interaction between the inside and the outside. The large hangarm that now hosts events and fashion shows, and the new six-storey tower, which interacts closely with the old constructions, stand out within the site area. Covered with a regular pattern of sunscreens, the new building breaks down the site’s symmetry and generates a powerful chromatic relations with the red-coloured exposed bricks of the low-level warehouse. Pedestrian paths run between the buildings, which are mainly located on the ground floor, in a sequence of solid structures and empty spaces in which landscaping plays a key role.

関連したプロジェクト

  • Adelaide Wharf
    Allford Hall Monaghan Morris
  • Erweiterung Druckerei Heer
    Rothen Architektur GmbH
  • Firmenzentrale Kaffee Partner
    3deluxe
  • 03.J.101
    Volt Architecten
  • Ausbau Office SENN BPM AG im Gewerbebau Noerd
    Rothen Architektur GmbH

piuarch によるその他のプロジェクト

IDF Habitat Headquarters
Champigny-sur-Marne, フランス
M89 Hotel
Milano , イタリア
Porta Nuova Building
イタリア
Quattro Corti
Sankt-Peterburg, Russia
GIVENCHY Flagship Store
Seul , South Korea
ENEL Pavilion
Milano, イタリア